Live Across 340+ Active Job Sites

Every order.
Every site.
One screen.

The live board for general contractors who can't afford a missed concrete pour. Material orders, delivery ETAs, and subcontractor windows — tracked to the minute.

dispatch.io / dashboard / all-sites
2 POs AWAITING APPROVAL
3 DELAYS FLAGGED
All Sites (12)
Site 7 — Marina
Site 3 — Downtown
Site 11 — Eastside
+ 9 more
PO-2400Concrete — Site 7
ON ROUTE
🚛
PO-2401Rebar Bundle C
DELAYED
PO-2402Crane — Tower B
CONFIRMED
PO-2403Lumber Pack 14
ON ROUTE
🚛
PO-2404Formwork Set 3
PO PENDING
PO-2405Aggregate Mix
DELIVERED
PO-2406Steel Beam 80x
ON ROUTE
🚛
PO-2407Safety Barriers
DELAYED
PO-2408Scaffolding Kit
CONFIRMED
PO-2409Pump Truck — AM
ON ROUTE
🚛
PO-2410Block Pallet 22
PO PENDING
PO-2411Waterproof Mem.
DELIVERED
PO-2412Precast Panels
DELAYED
PO-2413Mesh Roll 6mm
CONFIRMED
LAST SYNC: 07:51 AM · AUTO-REFRESH ON14 ORDERS TRACKED · 12 SITES LIVE
Scroll
Cost-of-Delay Calculator

What are missed deliveries
actually costing you?

Enter your numbers. Get the real figure. No email required.

24workers
2200
68$/hr
20200
6sites
150
4delays
120

Assumes 3.5 hrs average crew idle time per material delay. Based on AGC industry survey data (2024).

Annual cost of material delays

$0

That's $0/month in idle crew wages paid for standing around waiting for materials that didn't show.

Idle crew hours / year24,192 hrs
Delays / year across all sites288
Avg cost per delay event$6K
See Your Dashboard — Cut $0 in Losses

No signup · Sandbox loads in 8 seconds

Platform Modules

Six modules. One board.
Zero surprises.

Core

Live order tracking

Every PO, every status, every site — updated the moment a truck leaves the yard.

PO-2401Concrete — Site 7
PO-2402Rebar Bundle C
PO-2403Crane Tower B
PO-2404Lumber Pack 14
100%order visibility
Logistics

Delivery ETAs

GPS-linked delivery windows. Crew foremen get 30-min warnings automatically.

MTWTFSSM
🚛 3 deliveries todayAll on time
2.8 hrsavg delay reduction
Finance

PO approvals

Approve, reject, or escalate purchase orders from the field in one tap.

PO-2418
Pacific Rebar Co.
$24,800
AWAITING
PO-2419
ConcretePro LLC
$8,450
AWAITING
PO-2415
Steel Masters
$61,200
APPROVED
4 minavg approval time
Communication

Vendor comms hub

All vendor messages, delays, and confirmations in a single thread per order.

Pacific Rebar · 06:42
Delivery confirmed for 07:30 AM
You · 06:58
Add 2 bundles to PO-2401
ConcretePro · 07:12
⚠️ Driver running 40min late
Auto-notified Site 7 foreman
0missed notifications
Operations

Site-level dashboards

Each job site gets its own live board. Foremen see only what affects them.

Marina District8 orders
Downtown Core12 orders
Eastside Tower5 orders
Harbor Bridge9 orders
12sites on one login
Compliance

Immutable audit logs

Every change, every approval, every notification — timestamped and searchable.

14:32:01PO-2418 status → APPROVEDM.Torres
14:28:44Delivery ETA updated +40minSystem
14:15:20PO-2401 quantity editedR.Chen
13:58:07Site 7 foreman notifiedSystem
13:44:33Vendor Pacific Rebar repliedVendor
3 yrslog retention
Results in the Field

Who already switched.
What they stopped losing.

General Contractor
"We had a concrete pour delayed three hours because a PO sat in someone's inbox. Dispatch killed that problem on day one. Now every foreman knows the status before I do."
Derek Callahan
VP of Operations · Meridian Construction Group
Chicago, IL
Idle crew cost eliminated / yr$2.1M
On-time delivery rate (was 61%)94%
Active sites on one board11
Procurement
"I used to spend my mornings calling vendors for ETAs. Now Dispatch pings me when something's late — not the other way around. I haven't had a rebar shortage surprise in six months."
Yuki Tanaka
Procurement Manager · Strata Pacific Builders
Seattle, WA
Fewer procurement calls / week87%
Avg lead time visibility increase6 days
Emergency order premium saved$840K
Project Engineering
"A missed concrete delivery on Tower C cost us a full crew day — $47,000 gone. Three months on Dispatch, we haven't had a single idle day from a material failure."
Marcus Webb
Senior Project Engineer · Irongate Development
Houston, TX
Material-caused idle crew days$0
Avg delay-to-notification time3 min
PO audit trail compliance100%

Trusted by 340+ general contracting firms

Meridian Construction Group
Strata Pacific Builders
Irongate Development
Allied Structures Inc.
Vanguard Civil Works
Harbor Infrastructure
Summit Contracting
Crestline Builders
Meridian Construction Group
Strata Pacific Builders
Irongate Development
Allied Structures Inc.
Vanguard Civil Works
Harbor Infrastructure
Summit Contracting
Crestline Builders
No signup required · Sandbox loads in 8 seconds

Your site office,
finally quiet.

See a pre-populated dashboard with 14 live orders, 3 flagged delays, and a delivery timeline. No demo call. No sales pitch. Just the product.

340+ firms live
SOC 2 Type II
Procore & Autodesk integrations
99.97% uptime SLA
See Your Dashboard